Feedback and Ideas for QuickPlan

Give feedback!

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  1. Google Calendar integration

    Need the ability to connect multiple google accounts (work and personal) so that each Calendar in each account is a separate project and can be deconflicted. The lines between work and personal time these days becomes blurry and so having a way to see everything I’m doing — personally and professionally — is essential for understanding where workload (personal and professional tasks) is too much and or scheduling is too tight. Need to live hooks into Google Calendars from multiple google accounts (just like iOS supports) I can deal with not being able to update these calendars in your app…

    3 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      You have left! (?) (thinking…)
      0 comments  ·  Flag idea as inappropriate…  ·  Admin →
    • Version iPad Pro 12.9

      Il serait super une version adaptée à l’iPad pro 12.9 pouces.
      Merci

      1 vote
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        Signed in as (Sign out)
        You have left! (?) (thinking…)
        0 comments  ·  Flag idea as inappropriate…  ·  Admin →

        Hello,

        QuickPlan has already adapted for the 12.9 iPad.

        Would you please help to share more details about your idea?

        Thanks,

      • Pouvoir paramétrer la mise en page de sortie

        Bonjour,
        Merci pour cette App qui est top, mais lors de l’édition il n’est pas possible de choisir de mise à l’échelle ou de format portant ou paysage.... très dommage.

        1 vote
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          Signed in as (Sign out)
          You have left! (?) (thinking…)
          0 comments  ·  Flag idea as inappropriate…  ·  Admin →

          Thanks for contacting QuickPlan support.

          QuickPlan supports all the four iPad directions.

          I am not sure what exactly your idea is, would you please help to let me know the details?

          Best Regards,

          Philip

          ======

          Merci d’avoir contacté le support QuickPlan.

          QuickPlan prend en charge les quatre directions de l’iPad.

          Je ne suis pas sûr de ce que votre idée est exactement, pourriez-vous s’il vous plaît aider à me faire savoir les détails?

          Meilleures salutations,

          Philippe

        • Export financial data to Excel

          Export financial data to excel in a way that can be easily incorporated into other cash flow types of reports.

          3 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            Signed in as (Sign out)
            You have left! (?) (thinking…)
            0 comments  ·  Flag idea as inappropriate…  ·  Admin →

            For the macOS users:

            I’d like to let you know that we have just released the Resource Report app for the macOS. The app helps to create the work and cost report based on the project members, which is being enhanced continuously and we prefer to combine it into QuickPlan for macOS app after finalized the features. Please help to check out the details at https://goplan.app/lab/resource-report/

            Best,

            Philip

          • Financial reports/project costs

            Need a report to show project costs, including a total project cost. Would be nice to be able to see costs totaled by grouped tasks, total critical path cost, among other views, with customizations. Also, the ability to export just the financial data into Excel.

            3 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              Signed in as (Sign out)
              You have left! (?) (thinking…)
              0 comments  ·  Flag idea as inappropriate…  ·  Admin →

              Hello,

              For the macOS users.

              I’d like to let you know that we have just released the Resource Report app for the macOS. The app helps to create the work and cost report based on the project members, which is being enhanced continuously and we prefer to combine it into QuickPlan for macOS app after finalized the features. Please help to check out the details at https://goplan.app/lab/resource-report/

              Best,

              Philip

            • Link Respect Created Task but no Milestone

              Making a more option of link configuration that respect created task but no milestone can help the milestone become a deadline of the task. It would be helpful to develop the function that automatically showing the alert to those over-due tasks.

              1 vote
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                Signed in as (Sign out)
                You have left! (?) (thinking…)
                0 comments  ·  Flag idea as inappropriate…  ·  Admin →
              • Automatic detection of overallocations

                Hi,
                Could you please add the possibility to let the application to determine resources overallocation (example for sub-projects inside the same master project if you don't want to compute for all projects, even if a shared pool of resources and check over all projects would be really good).

                I found reference to something similar in https://mobilinked.uservoice.com/forums/204287-feedback-and-ideas-for-quickplan/suggestions/3988895-resources saying something was done but link takes to a generic page and no explanation on how to do this is given in response nor user guide. Thanks

                1 vote
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                  1 comment  ·  Flag idea as inappropriate…  ·  Admin →

                  Thank you for the idea.

                  Our plan is to implement real-time resource report for the macOS version. And static reports for the iOS versions (as the consideration of performance). Right now, for the iOS versions the static resource report is in the exported Excel file – a in-app page may be the choice.

                  Best Regards,

                  Philip

                • Pc version

                  Why there is no PC version where I can manage my gantry chart on my Microsoft laptop

                  1 vote
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
                  • 4 votes
                    Vote
                    Sign in
                    Check!
                    (thinking…)
                    Reset
                    or sign in with
                    • facebook
                    • google
                      Password icon
                      Signed in as (Sign out)
                      You have left! (?) (thinking…)
                      1 comment  ·  Flag idea as inappropriate…  ·  Admin →

                      Hello,

                      Thank you for the idea.

                      Would you please help to check if following features works for you?

                      - QuickPlan supports to customize the project calendar, to setting the working days and non-working days. For non-working days, the Gantt chart will show dark color column when in day timeline scale.
                      - QuickPlan supports to skip non-working day, so you can not schedule a task in non-working days

                      Please tap the project name on the tool to config the project properties.

                      Best Regards,

                      Philip

                    • Set programmed dates and slippage/actual dates achieved in the same line

                      Plan your project and add the dates, when this date is not achieved add actual date achieved & completed and a small section under each bar can be a different colour, this will highlight delays. At the moment all I can do is repeat the line directly underneath and amend title to match achieved timeframe. While doing the above you could add the number of days delayed, giving option to export to excel. Other than the above, great app, easy to use and very functional.

                      1 vote
                      Vote
                      Sign in
                      Check!
                      (thinking…)
                      Reset
                      or sign in with
                      • facebook
                      • google
                        Password icon
                        Signed in as (Sign out)
                        You have left! (?) (thinking…)
                        0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                        Thank you for the idea.

                        We are thinking to add some additional task columns, include the original task date columns (and the ability to switch showing gantt by actual or origin date). As the feature impacts much, we need a big version for it.

                        Best Regards,

                      • Reload always the last view of the project

                        With the iPad and bigger projects it is very complicated and takes time to find back the last view. Especially when you have a project over many months and hundreds of tasks.

                        Normally I always want to start at the actual time and the corresponding tasks.

                        Thank you very much for your efforts!

                        1 vote
                        Vote
                        Sign in
                        Check!
                        (thinking…)
                        Reset
                        or sign in with
                        • facebook
                        • google
                          Password icon
                          Signed in as (Sign out)
                          You have left! (?) (thinking…)
                          0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                          Thank you for the idea!

                          Would you please help to check if following the operations can rapid the navigating?

                          - Double-tap on the timeline to move the timeline to “today”
                          - Tap the search icon on the outline header, to find the task, app will scroll to the task.

                          And our practice is to collapsed the unfocused task groups (the tasks completed, or the tasks planned to execute far future) may be very helpful.

                          Thanks,

                          Philip

                        • Add Last Modified Date to Project Icons in opening screen

                          It’s nice to be able to open a project by just tapping the Project icon in the opening screen. That project becomes the current version and when you quit it saves(s) to the opening screen. If it also included the Last Modiified Date/Time, then it would be easier to know that you are working on the latest. This is especially true after you save to iCloud so that you can work on the project on another device. (I have 2 iPads in different locations). If you modify the iCloud version, it seems that it is saved back to iCloud and…

                          1 vote
                          Vote
                          Sign in
                          Check!
                          (thinking…)
                          Reset
                          or sign in with
                          • facebook
                          • google
                            Password icon
                            Signed in as (Sign out)
                            You have left! (?) (thinking…)
                            0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                            Hello,

                            Thank you for the idea.

                            My understanding of the major purpose to display the “Last Modified Time” is to check if the sync completed.

                            On the iPad, the project documents stored on the iCloud Drive and the project documents stored on the iPad are separated. And you can see that the “Last Modified Time” of the iCloud document shows at the second line (the first line is the project name) in the iCloud Drive project list. Would you please help to check it?

                            Best Regards,

                            Philip

                          • Add marker lines

                            Possibility to mark arbitrary dates with marker line and name

                            Common use for this is a „today“ marker.

                            This could also work with milestone variant

                            2 votes
                            Vote
                            Sign in
                            Check!
                            (thinking…)
                            Reset
                            or sign in with
                            • facebook
                            • google
                              Password icon
                              Signed in as (Sign out)
                              You have left! (?) (thinking…)
                              0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                              Hello,

                              Thank you for the idea. Could you please help to share us more details about the idea? I am sorry I could not get your point.

                              Best Regards,

                              Philip

                            • Color of non working days either adjustable or darker

                              Either on the iPad or the iPhone the Color of the non working days is to much the same as the week days, i really cant see the difference.

                              2 votes
                              Vote
                              Sign in
                              Check!
                              (thinking…)
                              Reset
                              or sign in with
                              • facebook
                              • google
                                Password icon
                                Signed in as (Sign out)
                                You have left! (?) (thinking…)
                                0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                                Thank you for the idea.

                                When the timeline is at “day” scale (change it on the toolbar), the background color of the working days and non-working days are different. Would you please help to check it?

                                Best regards,

                                Philip

                              • Redo button

                                Undo button is helpful — undo/redo would be even better!

                                3 votes
                                Vote
                                Sign in
                                Check!
                                (thinking…)
                                Reset
                                or sign in with
                                • facebook
                                • google
                                  Password icon
                                  Signed in as (Sign out)
                                  You have left! (?) (thinking…)
                                  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
                                • Education / Students

                                  Hi QuickPlan team, Your app looks amazing; I was wondering if you have a pricing version for Students / education ??

                                  1 vote
                                  Vote
                                  Sign in
                                  Check!
                                  (thinking…)
                                  Reset
                                  or sign in with
                                  • facebook
                                  • google
                                    Password icon
                                    Signed in as (Sign out)
                                    You have left! (?) (thinking…)
                                    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
                                  • Full view of the project

                                    I‘d really like to see the hole Project even if i might hardly be able to read anything. But to know where the project is going and to have an overview of how many tasks are currently running is essential for me. Just collapse to the more flattened view is not always enough.

                                    besides from that its a really nice app and absolutely worth the money.

                                    3 votes
                                    Vote
                                    Sign in
                                    Check!
                                    (thinking…)
                                    Reset
                                    or sign in with
                                    • facebook
                                    • google
                                      Password icon
                                      Signed in as (Sign out)
                                      You have left! (?) (thinking…)
                                      0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                                      Hello,

                                      Thanks the idea.

                                      Additional to LIST display style, to know what are your doing, would you please help to try the today widget?

                                      Best,

                                      QuickPlan Team

                                    • Imported from project, dates changed

                                      I am importing my file form project, but it immediately changes all the dates of my project! My guess is QuickPlan assumes the day of the import is the first day of the project. HELP

                                      1 vote
                                      Vote
                                      Sign in
                                      Check!
                                      (thinking…)
                                      Reset
                                      or sign in with
                                      • facebook
                                      • google
                                        Password icon
                                        Signed in as (Sign out)
                                        You have left! (?) (thinking…)
                                        0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                                        Hi,

                                        Do you mean the after importing from XML file, at beginning the date of the imported project is correct, then QuickPlan automatically changes the date?

                                        Or do you mean you are importing from OPML file. OPML file is a text file, you can open it text editor to check if there is date information in it.

                                        Or would you please help to share us the details.

                                      • 1 vote
                                        Vote
                                        Sign in
                                        Check!
                                        (thinking…)
                                        Reset
                                        or sign in with
                                        • facebook
                                        • google
                                          Password icon
                                          Signed in as (Sign out)
                                          You have left! (?) (thinking…)
                                          0 comments  ·  Flag idea as inappropriate…  ·  Admin →

                                          Hello,

                                          Thanks the idea.

                                          My understanding is to “display the tasks planned at next 2 or 4 weeks”.

                                          QuickPlan know supports to display tasks in LIST style with some predefined list, such as tasks in this month, would you please help to check if it’s what you want? (https://quickplan.app/documents/ios/user-manual/display/tree-list)

                                          And “QuickPlan for macOS” supports to create a new partial project by specific date range, this may be the better solution for you. (https://quickplan.app/documents/mac/user-manual/sharing#date)

                                          Best,

                                        • joint

                                          add possibility to put internet links on task

                                          5 votes
                                          Vote
                                          Sign in
                                          Check!
                                          (thinking…)
                                          Reset
                                          or sign in with
                                          • facebook
                                          • google
                                            Password icon
                                            Signed in as (Sign out)
                                            You have left! (?) (thinking…)
                                            0 comments  ·  Flag idea as inappropriate…  ·  Admin →