Feedback and Ideas for QuickPlan

  1. Pencil on iPad not perfect

    Apple Pencil (new version) on newest iPad Pro 11 is not functional in a number of functions. Maybe it would be good to test it. Like: collapsing or expanding groups on the triangle does not work.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  2. En français...

    Le lundi est le premier jour de la semaine
    Le calcul du coût du travail devrait aussi pouvoir se faire à la journée.
    Est-il possible de lié au calendrier? Ou d’inclure les jours fériés? Les vacances des ressources? Les coûts d’investissements? Il serait aussi intéressant de pouvoir inclure des livrables, des risques... etc...

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  3. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  5. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. Add Mouse support to the app

    Add mouse support to the app.
    - items option
    - scroll horizontal
    - others

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  7. Make Link button a 3 toggle switch

    Make the link toggle switch 3 settings.

    Press once — Finish to start
    Press twice — link
    Press 3rd Time — off

    This way I can toggle if I want to move the entire time line or not.. there are time I want to make one change.. then change my mind I can’t easily go back because there were changes I DO want to keep since that “mistake” I Hope that made sense.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  8. Timeline Format

    Edit: What I am looking for is to be able to create a roadmap without specific dates. People see the dates and then lock in on it vs seeing generalization of x weeks out, etc.

    Would it be possible to have # of days/weeks/months as an option and not calendar days? On day 1 do X then day 3 do this then day 4. It is repeatable regardless. This way when I open it to tweak it for the next project I don’t have to go adjust the dates. Not a huge deal. But you did ask for ideas. Thanks…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  9. Missing Label for Task groups

    Please include the missing label in task groups on a GANTT chart, when I select Name and Resource to be shown. It shows up, when I select only Name of the task. Refers to PDF for printing the GANTT.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  10. Uhrzeit- und Datumeingabe

    Also:
    Es wäre gut, wenn es die Möglichkeit gibt, mit Uhrzeiten planen zu können. Die Zeiten werden zur Zeit als Block pro Tag berechnet, so kommt es, dass immer eine vorgegebene Zeit berechnet wird, auch wenn der Zeitaufwand lediglich eine Stunde am Tag betrug.
    Auch wäre es gut, wenn für eine Periode (zum Beispiel drei Monate) einzelnen Tage verplant werden könnte. Zum Beispiel: 01.06; 09.07, 18.07 für zwei Stunden (09:00 bis 11:00 Uhr).
    Das führt zu einer genaueren Berechnung der tatsächlichen Zeit und Kosten.

    Besten Dank

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  11. Import from other projects and overall resources’ list

    I have the same resources (members) for most of my project. But I don’t want to select one by one everytime I start a new project. Is there a way to import members, resources or stuff like that from other projects?

    Also, does the app have an “overall list of members” for projects. Not every contact in my iPad is elegible for my projects. I wish I didn’t have to go through my friends and family’s contact everytime I make a list of the members for a project, unless they really are active in any of my projects.

    As for…

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  12. How do i schedule the plan

    Sorry but how do I schedule my plan. Is there a Function Icon to Schedule - in in Primavera I would press F9

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  13. New template for account keeping - project, invoice no., amount, task, amount paid, date paid, balance, mayment method

    Great app, I have installed on my iPad, iPhone and MacBook, it would be great to have an account keeping template able to be modified such as:
    PROJECT - TASK - % COMPLETED - INV NO - AMOUNT - AMOUNT PAID - BALANCE - PAYMENT METHOD

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  14. project journal log

    Each project to have a journal that we can write issues that occur during the project.
    When the note is logged it also provides the time and date logged, so we can go back through journal to asses areas that can be improved through our future projects

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  15. Please add more field for project members

    It will be great to see more fields for project members where we can add telephone numbers, contact info like address, and note

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Thank you for the idea.

    QuickPlan is being enhanced continuously, we have released more than 30 versions in the last years.

    iOS is opening more and more, and to keep QuickPlan focusing on the project schedule, would you help to check if you can manage the information of the contacts in a contact app, I think it is not very complicated to search the contact when needed.

    We have many features in our willing list, and you may find the price of the QuickPlan app is super lower ( less than 1/5 of the same kind with at/above the acceptable level of quality). Right now the non-core features are not prioritized.

    Best Regards,

    Philip

  16. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  17. How to create link between tasks

    Easy connection between tasks. I don’t see it in the APP

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  18. replace “note” with “check list”

    this app is of great use and i really appreciate it.
    Almost satisfied with it.
    Is is possible to add check list tab?
    I would like to make a simple check list for each task.
    I’m currently type tasks(like todo) directly in the note.
    It is perfect if i can one-tap the check list i made and the %comp links with the check list.
    The simple check list will be totally fine.
    you do not have to make a complicated one.
    i just want to see the current %comp by putting a check mark on the check list.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  19. Allow to print the critical path

    When printing the chart, there should be an option that the Critical Path could be shown on the printing.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  20. add a red drop line to the programme

    Hi is it possible to add a red drop line to the programme it would be really helpful for showing progress especially if you can drop the line on the day and then you can clearly see if your ahead or behind with progress.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →