Feedback and Ideas for QuickPlan

Give feedback!

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  1. 4 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →

    Hello,

    Thank you for the idea.

    Would you please help to check if following features works for you?

    - QuickPlan supports to customize the project calendar, to setting the working days and non-working days. For non-working days, the Gantt chart will show dark color column when in day timeline scale.
    - QuickPlan supports to skip non-working day, so you can not schedule a task in non-working days

    Please tap the project name on the tool to config the project properties.

    Best Regards,

    Philip

  2. Show critical path on our project

    Hello,

    I really like the program but I’m missing this function.
    It would be really nice to be able to see the critical path of our project just the way we do with Ms- Project. This way we no longer will have to use MS project and we’ll be able to work only with this great tool.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  3. Automatic detection of overallocations

    Hi,
    Could you please add the possibility to let the application to determine resources overallocation (example for sub-projects inside the same master project if you don't want to compute for all projects, even if a shared pool of resources and check over all projects would be really good).

    I found reference to something similar in https://mobilinked.uservoice.com/forums/204287-feedback-and-ideas-for-quickplan/suggestions/3988895-resources saying something was done but link takes to a generic page and no explanation on how to do this is given in response nor user guide. Thanks

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →

    Thank you for the idea.

    Our plan is to implement real-time resource report for the macOS version. And static reports for the iOS versions (as the consideration of performance). Right now, for the iOS versions the static resource report is in the exported Excel file – a in-app page may be the choice.

    Best Regards,

    Philip

  4. Cost limit and formations

    Incrise thé cost limitation and add dynamic format.
    I have Cost over 10 Mio to insert in my planification but it’s imposible to go over 999’999 currency in cost field.
    This idea give me an over idea. For big amont it was intresting than format can be dynamic. For exemple :
    100 > CHF 100,
    1000 > CHF 1’000,
    10000 > kCHF 10 or CHF 10’000,
    100000 > kCHF 100 or CHF 100’000,
    1000000 > MiCHF 1 or kCHF 1’000 or CHF 1’000’000,
    Depending new options of currency format.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  5. Excel export - Export option - Grant Bykov week or By quater for long project

    Excel export - I’d Lake top have capacity to export on Quater mode for projetct longuer than 1 year.
    Exemple : if I use my plan in month mode : 1 Excel colomn = 1 Month, if I use my plan in Quater mode, 1 Excel colomn = 1 Quater on Gant export.
    Fonction depending of visualation mode or by a selected export option.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. calendar view??

    Id like to see all tasks by date.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  7. workload across projects

    Some projects activity need to occur in parallel, Id like to have a way to see if I am putting too much workload in one resource in a day, or week.

    This can be done easily with a week-days view and filtering in the calendar all tasks across that week.

    Another workaround could be the ability to hide tasks so I can have a look to whats going on in a particular week or day.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  8. Export financial data to Excel

    Export financial data to excel in a way that can be easily incorporated into other cash flow types of reports.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    For the macOS users:

    I’d like to let you know that we have just released the Resource Report app for the macOS. The app helps to create the work and cost report based on the project members, which is being enhanced continuously and we prefer to combine it into QuickPlan for macOS app after finalized the features. Please help to check out the details at https://goplan.app/lab/resource-report/

    Best,

    Philip

  9. Google Calendar integration

    Need the ability to connect multiple google accounts (work and personal) so that each Calendar in each account is a separate project and can be deconflicted. The lines between work and personal time these days becomes blurry and so having a way to see everything I’m doing — personally and professionally — is essential for understanding where workload (personal and professional tasks) is too much and or scheduling is too tight. Need to live hooks into Google Calendars from multiple google accounts (just like iOS supports) I can deal with not being able to update these calendars in your app…

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  10. Pc version

    Why there is no PC version where I can manage my gantry chart on my Microsoft laptop

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  11. Version iPad Pro 12.9

    Il serait super une version adaptée à l’iPad pro 12.9 pouces.
    Merci

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Hello,

    QuickPlan has already adapted for the 12.9 iPad.

    Would you please help to share more details about your idea?

    Thanks,

  12. Pouvoir paramétrer la mise en page de sortie

    Bonjour,
    Merci pour cette App qui est top, mais lors de l’édition il n’est pas possible de choisir de mise à l’échelle ou de format portant ou paysage.... très dommage.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Thanks for contacting QuickPlan support.

    QuickPlan supports all the four iPad directions.

    I am not sure what exactly your idea is, would you please help to let me know the details?

    Best Regards,

    Philip

    ======

    Merci d’avoir contacté le support QuickPlan.

    QuickPlan prend en charge les quatre directions de l’iPad.

    Je ne suis pas sûr de ce que votre idée est exactement, pourriez-vous s’il vous plaît aider à me faire savoir les détails?

    Meilleures salutations,

    Philippe

  13. Financial reports/project costs

    Need a report to show project costs, including a total project cost. Would be nice to be able to see costs totaled by grouped tasks, total critical path cost, among other views, with customizations. Also, the ability to export just the financial data into Excel.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Hello,

    For the macOS users.

    I’d like to let you know that we have just released the Resource Report app for the macOS. The app helps to create the work and cost report based on the project members, which is being enhanced continuously and we prefer to combine it into QuickPlan for macOS app after finalized the features. Please help to check out the details at https://goplan.app/lab/resource-report/

    Best,

    Philip

  14. Link Respect Created Task but no Milestone

    Making a more option of link configuration that respect created task but no milestone can help the milestone become a deadline of the task. It would be helpful to develop the function that automatically showing the alert to those over-due tasks.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  15. Set programmed dates and slippage/actual dates achieved in the same line

    Plan your project and add the dates, when this date is not achieved add actual date achieved & completed and a small section under each bar can be a different colour, this will highlight delays. At the moment all I can do is repeat the line directly underneath and amend title to match achieved timeframe. While doing the above you could add the number of days delayed, giving option to export to excel. Other than the above, great app, easy to use and very functional.

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Thank you for the idea.

    We are thinking to add some additional task columns, include the original task date columns (and the ability to switch showing gantt by actual or origin date). As the feature impacts much, we need a big version for it.

    Best Regards,

  16. Reload always the last view of the project

    With the iPad and bigger projects it is very complicated and takes time to find back the last view. Especially when you have a project over many months and hundreds of tasks.

    Normally I always want to start at the actual time and the corresponding tasks.

    Thank you very much for your efforts!

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Thank you for the idea!

    Would you please help to check if following the operations can rapid the navigating?

    - Double-tap on the timeline to move the timeline to “today”
    - Tap the search icon on the outline header, to find the task, app will scroll to the task.

    And our practice is to collapsed the unfocused task groups (the tasks completed, or the tasks planned to execute far future) may be very helpful.

    Thanks,

    Philip

  17. Add Last Modified Date to Project Icons in opening screen

    It’s nice to be able to open a project by just tapping the Project icon in the opening screen. That project becomes the current version and when you quit it saves(s) to the opening screen. If it also included the Last Modiified Date/Time, then it would be easier to know that you are working on the latest. This is especially true after you save to iCloud so that you can work on the project on another device. (I have 2 iPads in different locations). If you modify the iCloud version, it seems that it is saved back to iCloud and…

    1 vote
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Hello,

    Thank you for the idea.

    My understanding of the major purpose to display the “Last Modified Time” is to check if the sync completed.

    On the iPad, the project documents stored on the iCloud Drive and the project documents stored on the iPad are separated. And you can see that the “Last Modified Time” of the iCloud document shows at the second line (the first line is the project name) in the iCloud Drive project list. Would you please help to check it?

    Best Regards,

    Philip

  18. Add marker lines

    Possibility to mark arbitrary dates with marker line and name

    Common use for this is a „today“ marker.

    This could also work with milestone variant

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →

    Hello,

    Thank you for the idea. Could you please help to share us more details about the idea? I am sorry I could not get your point.

    Best Regards,

    Philip

  19. Redo button

    Undo button is helpful — undo/redo would be even better!

    4 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  20. joint

    add possibility to put internet links on task

    5 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3 4 5 6
  • Don't see your idea?

Feedback and Ideas for QuickPlan

Feedback and Knowledge Base