Change needed
Quick plan works great except that for one thing that makes a real pain, that is when you move an item backwards in time the linked items should move back with it. It's a real hassle to have to do this manually with dozens of linked items.
Today I shortened a task by several days, and all the following linked tasks had to manually be moved backwards. Please fix this.
Hello,
QuickPlan 6.0 gone live – included option to define the task link behavior
Please visit quickplan.mobilinked.biz for more details
Best regards,
QuickPlan – http://quickplan.mobilinked.biz
WBS – http://wbs.mobilinked.biz
OrgChart – http://orgchart.mobilinked.biz
QuickPlan 6.0 will provides option to user to choose the link behaviour – following the existing behaviour “Finish to Start” like MS project, or the behaviour to “Move all linked task together”
Br,
-
Brad commented
Yes all linked task should move if linked