Feedback and Ideas for QuickPlan
165 results found
-
More outline levels support - QuickPlan 1.3
Support 3 outline levels, also support to import/export 3 levels of Microsoft Project Plan(in xml format) fils
9 votesReleased at QuickPlan 1.3
-
Universal app for iPhone and iPad
Use the same purchase with iphone and iPad.
9 votesHello,
Thanks for your idea.
QuickPlan for iPad and for iPhone have similar functionalities, but different UI navigation system. For better user experience, it’s better to separate them.
The price will increase ( = the price of QuickPlan for iPad + for iPhone). Separating apps give users options on the spending.
Best regards,
Mobilinked
-
Multiple links to a task
When using linking feature on Version 2.0, the only 1 link limit makes me feel confused.
When we need the linking feature, normally, it means we need to do another thing before start to do something, which actually means "Prerequisite".
So the problem comes: some times, before start some thing, we have to finish other 3 things, and there are no relation ship between those 3 things, there could be scheduled parallelly. Then on quick plan , we need to make 3 links from 3different task item to the same task.And it looks not implemented yet on 2.0.
Hope…8 votesUpdate: New version gone live
It will be super helpful to get your help to rate/write review at https://itunes.apple.com/app/id621375878 if you like it
Hello,
Thanks for the idea. “Many to one” “Finish to start” task link feature will be included at QuickPlan 4.0 for iPad and 2.0 for iPhone.
Br,
Mobilinked.
-
8 votes
Please using CHILD project
Hello,
Thanks for idea. I’d like suggest to organize the tasks into child project – so we have totally 6 outline levels and the tasks can be organized better than in just one project.
Br,
Mobilinked
-
Auto Update of linked Tasks
Hi, great piece of Software! However, I have not yet figured out how links affect tasks. If I e.g. create a finish-start link between task 1 and task 2 I would expect that task 2 will always start after task 1. For some reasons task 2 will not be moved regardless of task 1 position. Why?
Many zhanks and best regards
Sebastian
8 votesHello,
Thanks for the comment.
The link in project schedule is task date constraint – the finish date of predecessor task should be early than the start date of successor task,.
Next version, one option will be for user to choose the link behaviour:
– Move linked task together
– Or follow “finish to start” link traditional behaviourBest regards,
- Close this idea as it should be a ticket.
-
Quick data input
Is it possible to add the dates and duration in the quick task input to help with speedy project plan creation. I was thinking something alon these lines.
Task1, 11/02/2914, 2
Task2, 20/02/2014, 5
Etc8 votesDone
-
Adjustable row height
Hi,
Would be invaluable to be able to adjust row height to fit as many tasks on one page as possible.
Best if it could be adjusted via a gesture like tap and hold or some variation on pinch to zoom.Thanks
8 votesQuickPlan 6.0 done it
-
Today's task overview
It would be useful to have an overview page/tile which would show today's tasks from all projects in one place. It's really helpful when working on multiple projects. Currently you have to go to each project separately and see what you have to do today.
7 votesHello,
QuickPlan 7.0 has gone live with the feature of today widget – to list all the in-progressing tasks of today in today widget.
Also for iPhone edtion, Apple watch has been supported for the today in-processing tasks.
http://quickplan.mobilinked.biz/support/releasenotes/quickplan7/
Appstore rating are reset with every new version of QuickPlan, would you please help us out with a good review/rate at https://itunes.apple.com/app/id621375878 and https://itunes.apple.com/app/id699434089
Best Regards,
Philip Lee (@iosmobilinked), Support, Mobilinked (www.mobilinked.biz)
-
Operating Sytems Options
I would love to see this app become available for Android and Blackberry!! It would be sooo beneficial for me to be able to view, and edit my schedule from my Blackberry when i do not have my ipad with me. I can axcess android apps on my blackberry, so if it was only android, i could make it work.
7 votesdone
-
Move tasks between projects
It would be handy to be able to move or copy a task (and child tasks) between projects. One type of task could be used in multiple projects and this would obviate the need to retype. Also, if a project is substantially complete, one might want to move the unfinished tasks to a new project and close out the completed one.
7 votesUpdate: QuickPlan 3.0 for iPad and QuickPlan 1.0 for iPhone have gone live.
QuickPlan 3.0 is coming with the enhancement to copy/paste tasks across projects – http://mobilinked.biz/?p=294
Thanks for the idea.
-
Calendar View
Would it be possible to add a calendar view? I would love to see the schedule plotted on a calendar as an option like MS Project.
Thanks
7 votesHello,
QuickPlan 7.0 has gone live with the feature of today widget – to list all the in-progressing tasks of today in today widget.
Also for iPhone edtion, Apple watch has been supported for the today in-processing tasks.
http://quickplan.mobilinked.biz/support/releasenotes/quickplan7/
Appstore rating are reset with every new version of QuickPlan, would you please help us out with a good review/rate at https://itunes.apple.com/app/id621375878 and https://itunes.apple.com/app/id699434089
Best Regards,
Philip Lee (@iosmobilinked), Support, Mobilinked (www.mobilinked.biz)
-
Include notes in exported files
-- Updated by Mobilinked --
Where are the notes? How our recipient can have the information content in the Notes of a Task/Activity?
7 votesUpdate: New version gone live
It will be super helpful to get your help to rate/write review at https://itunes.apple.com/app/id621375878 if you like it
Notes has been included at PDF file, more detail please visit http://mobilinked.biz/?page_id=573
Best,
-
7 votes
Hello,
Undo is ready with QuickPlan 5.0, for more detail about iCloud feature, please visit http://mobilinked.biz/?page_id=882 for more details.
It will be super helpful to get your help to review/rate at appstore(https://itunes.apple.com/app/id621375878)
Best regards,
-
Simple Links between tasks
Link tasks - when one moved, another one will be moved according to date changing
6 votesHello,
QuickPlan 2.0 has been submitted to Appstore for review, which includes “Finish to Start” task link feature.
What’s new video : http://lnkd.in/-j-XQ9
Feature video: http://lnkd.in/V3hwS3Best regards,
-
Auto update calendar
Hi I like the feature that allows you to add tasks to the iPhone calendar. Would it be possible to set a project to add tasks to the calendar by default and update after editing - possibly by an update on exit command.
6 votesHello,
QuickPlan 7.0 has gone live with the feature of today widget – to list all the in-progressing tasks of today in today widget.
Also for iPhone edtion, Apple watch has been supported for the today in-processing tasks.
http://quickplan.mobilinked.biz/support/releasenotes/quickplan7/
Appstore rating are reset with every new version of QuickPlan, would you please help us out with a good review at https://itunes.apple.com/app/id621375878 and https://itunes.apple.com/app/id699434089
Best Regards,
Philip Lee (@iosmobilinked), Support, Mobilinked (www.mobilinked.biz)
-
Font Size
I use reading glasses, but I have to supplement them with a magnifying glass to read the white font on the color labels. Please enlarge the font size or increase the contrast between font color and background color. I simply don't have time to bother with this app if I can't read it quickly at a glance.
6 votesI’d like to let you know that QuickPlan for iPad 8.2 will provides an option to change the text size on the Gantt chart. Please check out the release notes at http://www.quickplan.xyz/documents/quickplan-for-ios/releasenotes/quickplan-for-ipad-iphone-8-2
Now the beta of next version is ready, please contact me if you want to get the app earlier by downloading the beta version via App Store Test Flight service?
-
Weeknumbers and days in PDF Export
Is iT possible to keep weeknumbers and days in a PDF export? When i export a project longer then 7 weeks, weeknumbers. And days of THE week disappear. So i have to export to excel to see the weeknumbers and days of THE week.
Kind regards.
5 votesAs explained that the PDF size is limited, so App has to adjust timeline scale.
Keep the project be small and short is good for management and reporting – that’s why quickplan supports sub-projects
-
Show tasks for a specific contact
I'd like to be able to send a PDF of all his/her tasks to a contact. To do this I'd have to only show their specific tasks and then share.
Showing only the tasks for a contact would also make it easier to update progress of a specific contact.
5 votesHello,
QuickPlan 5.0 supports to duplicate a project for specific users. please visit http://mobilinked.biz/?page_id=882 for more details.
It will be super helpful to get your help to review/rate at appstore(https://itunes.apple.com/app/id621375878)
Best regards,
-
Automatic sync between different devices (or something similar)
It would be nice to see something like automatic syncing instead of exporting and importing from other apps, at least with nmicrosot project files
5 votes -
Week start on Monday
Please let the starting day of the week be configurable. In my country the week starts on Monday, like in whole Latin America (at least).
Thank you for a great app.
5 votesUpdate: New version gone live
It will be super helpful to get your help to rate/write review at https://itunes.apple.com/app/id621375878 if you like it
Hello,
QuickPlan 4.0 for iPad and 2.0 for iPhone will include the feature for monday as the first week day.
http://mobilinked.biz/?page_id=573
Best regards,
Mobilinked
- Don't see your idea?