  1. Various ideas

    Hi! It's me again. With some thoughts and possible ideas. ;)

    ---- lock mode

    I've been thinking about the lock mode and came up with this.

    One button... Three modes.
    Unlocked.
    Locked relative - locked to the immediate upper group. Locks position, duration and inner data.
    Locked absolute - locks to the main timeline. So if you move the group it will extend in time since absolute locked tasks won't change duration nor position.

    ---- original time schedule

    Something like a snapshot of your initial planning. Plans change constantly but it would be nice to have a record of your…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Assign Resources to Main tasks

    Sometimes we have a main task divided into other smaller tasks and the resources are the same, as of now there is no way to assign resources to a group of tasks at the same time, it would be nice to have the option

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Change needed

    Quick plan works great except that for one thing that makes a real pain, that is when you move an item backwards in time the linked items should move back with it. It's a real hassle to have to do this manually with dozens of linked items.

    Today I shortened a task by several days, and all the following linked tasks had to manually be moved backwards. Please fix this.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hello,

    QuickPlan 6.0 gone live – included option to define the task link behavior

    Please visit quickplan.mobilinked.biz for more details

    Best regards,

    QuickPlan – http://quickplan.mobilinked.biz
    WBShttp://wbs.mobilinked.biz
    OrgChart – http://orgchart.mobilinked.biz


    QuickPlan 6.0 will provides option to user to choose the link behaviour – following the existing behaviour “Finish to Start” like MS project, or the behaviour to “Move all linked task together”

    Br,

  4. QuickPlan to WBS

    Hi,

    I've started using WBS as the starting point for getting the initial project format/data setup, then exporting and opening it in QuickPlan, which all seems to work well.
    But I want the ability to send the updated project from QuickPlan back to WBS. It seems the .xls template used by the QuickPlan export is not the same as the template expected by the WBS .xls import, so it is not currently possible without manual intervention to modify the exported .xls file.

    So is it possible to add QuickPlan -> WBS?

    Also, any plans to expand the QuickPlan Export to…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Increase font size when printing

    When printing the font is too small. Please provide an option to adjust don't size. Thanks

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Open Last Project on Launch

    Amazing app. Would be nice to auto load the last project instead of having to tap it in the library.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Folding tabs

    It would be a great help if the app could remember if af task was left with the child tasks folded or unfolded in the lefft column.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Quickplan Needs 2 important feature

    • timebar labels should keep visibility while sliding Whole app with two finger. ( bar. Labels goes hidden while sliding. İt is bad idea)

    • documents should remember position of last view and what is expanded what is collapsed.

    These are important. PLease fix

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Grid lines

    Is it possible to get grid lines or vertical lines on the chart view. It would help it line up the task with the date at the top of the chart.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Great products, but I miss...

    • It would be nice to have a start-start and finish-finish relationship between activities
    • When exporting the scehedule / gant diagram is would be nice to also be able to export the sub project activities
    • It would also be nice to be able to use OneDrive cload server in addtion to Dropbox
    • If this sould be used as a management informastion system it, would be nice with a auto sync. system.

    Anyway, the system thay exist is Excelent and of high value togehter with the WBS. Im looking forward to addtional functionality :-)

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    update: Done with version 6.x

    1. Auto sync
    QuickPlan 6.0 (next version) includes the enhance of iCloud sync – projects can be automatic sync to other devices via iCloud

    2. Exporting sub project tasks
    We removed this feature from version 6.0, will includes it in version 6.1
    And now exported excel file includes the tasks of sub project

    3. OneDrive
    iOS is becoming more open, and now iOS8 supports more features to supports app interaction. I guess that most of the cloud storage app will provides extension to be accessed from other app directly. That’s why there is no direct iCloud support in WBS and OrgChart (my other apps) – we can just export the project as project file, and using sharing panel to share (in WBS, you can just export project as wbs file, and then open in 3rd party cloud apps)

    4. Other task link types
    N/A

  11. Use of iPhone 6+ screen resolution

    Will the app be updated to exploit the increased screen resolution of the iPhone 6 Plus?

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Export selected colums with customized caption

    Thanks awesome app

    1. I want to exclude some columns when export excel. For example Resource, Contact, . . ..
    2. I want to export columns with customized caption
    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Sorting

    Hi I would like to be able to use the columns to sort/filter the data e.g. Sort the tasks into start date order or sort/filter by contact.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Very Simple, Perhaps Demo Level

    Hello,
    I am a volunteer as the managing director and editor of a large website (portal) aiming to protect our polar regions from careless / unscrupulous shipowners taking advantage of the meeting ice. We have no money and are all paying what we can afford to get this done. I have begun using WBS to define our page development process. It is not complex, and we can Ill afford the cost of Quickplan. In addition it is a good deal more complex than our modest needs. For folks like us a very simple 'dumbed down' version would be useful, and…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    completed  ·  0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Capacidad de poder copiar un proyecto y pegarlo en otro

    Soy agricultor y hago un proyecto para cada predio de siembra, me gustaría poder hacer un solo proyecto maestro y poder ese mismo copiarlo al número de predios que voy a sembrar ese año es decir hacer su proyectos por cada predio. Y utilizar ese mismo proyecto maestro al siguiente año con el número de predios a sembrar ya que repito las mismas actividades cada año.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    • The basic existed features *

    QuickPlan now supports to duplicate project, and QuickPlan supports to change the project start date easily. For your needs, I’d like suggest:

    - Create a master project as you have done.
    - At the begin of every year, just duplicate the project to create a new project. More details please visit: http://quickplan.mobilinked.biz/support/help/projectsmgnt/#project
    - Then open the duplicated project, and to change the project start date. More details please visit: http://quickplan.mobilinked.biz/support/help/prjprops/

  16. Schedule Custom

    The application not allow custom schedule for mark holiday and another special days.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. resource assignment sheet per day

    It would be great to have the option to have the resource assignment sheet not only in weeks, but as well in days if exported to excel

    BR
    Nanning

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hello,

    Thanks for the idea.

    The time scale in the excel file is same as in the user interface, please just switch the timeline scale to “day” (tap day scale on toolbar), then to export as Excel file

    Regards,

    Philip

  18. 1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    No problem now.

    BTW: For critical business, I’d like suggest NOT to install iOS beta version. Even the new iOS formal release is available, it’s better to wait weeks for the apps to be ready.

    Best,

  19. 1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. 0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    completed  ·  0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Ideas for QuickPlan

Categories

Feedback and Knowledge Base